Loans Design Team System
LOANS DESIGN TEAM STRUCTURE
Daily standup with designers
Task prioritisation
Reduce check in time to increase focus time.
Update the Roadmap Sheet with the status of your task to reduce check-in frequency
Loans Team Design Process (Task estimation should be based on these)
Time to design (Design in progress)
Designer review
Team review - 30 mins (All feedback must documented in a single doc, will inform TPM about undocumented feedback)
TPM review - 30 mins (To minimize TPM not being in sync with the design)
Done
Research/ Study/ Equip
Close on time
One hour every day should be dedicated to research and learning how to make a task or design better (Udemy account for each designer)
Resources needed - People, Money, etc
One source of truth and task should be Bukola (To reduce task-switching, context-switching and random prioritisation)
Any team members should inform the PM first and not randomly assign tasks to designers.
Do you have any other process we should introduce to make our work quality better and our process easier?